Mission Bay
A pool dig out at the rear of a large house with very limited access, requiring the use of a conveyor system.
Recent Work
A pool dig out at the rear of a large house with very limited access, requiring the use of a conveyor system.
Three tiers of retaining walls on a 1:2 slope. This job required a lot of planning as there were some issues to overcome:
The beginnings of a house build on large and steep property overlooking Clevedon. Our first earthworks stage included:
Excavation of multiple trial pits for a geotechnical investigation. The traditional method of doing bore logs couldn't proceed past about 800mm due to rock, so excavation was required. We excavated to depths of between 3 - 4.5m.
Challenges included: