ARDMORE
Removal of all debris, waste concrete (which has gone back to our yard to be recycled), stump removal and creating a burn pile. Vegetation stripped to provide an area for a relocatable house, with an access track made from run-of-pit metal.
Recent Work
Base fill of a new pool for Precision Pools with our recycled GAP65 aggregate. The site was narrow, with tight access for trucks, meaning we had to ferry the metal in with our track loader. The pool base used approx 120t of recycled aggregate.